I'm going to combine the Engineering Requirements and TestPlan together
into a single Milestone (ie., deliverable) with an extended date (9/29 for the draft). The
Deliverable needs to include:
-
A Subsystem Decomposition (written by the whole group) to include:
- A short description of each subsystem
- The interfaces between subsystems (showing subsystem relationships) including a pictorial
- Scenarios from the User Requirements played out by your subsystems
- TOFS-generated Complete Document (1 per subsystem) to include:
- Engineering Requirements as described in Engineering Requirements (using TOFS)
- Test cases for all Engineering Requirements (using TOFS)
- Test (traceability) Matrix as demonstrated in class (using TOFS)